Work on Industrial Project in Stratford upon Avon Begins

Mar

26

Work on Industrial Project in Stratford upon Avon Begins

Works have commenced on site by Avonvale Construction Ltd to build a 15,000sq ft extension to the Tappex Thread Inserts Ltd factory in Stratford upon Avon. Working in partnership with Avonvale Construction Ltd, Breese and Earle Electrical Services Ltd will be carrying out the design, supply and installation of the electrical services within the extension. We will also be replacing the main 800A distribution board located within the existing factory with a new Schneider twelve way Powerpact 4 panel board.

The existing Tappex Thread Inserts Ltd factory is illuminated by LED lighting and the client specification required LED lighting in the new extension to help minimise their overall carbon footprint for the site. CPL Electronics Ltd automatic controls will be installed along side the LED system to ensure the most efficient use of the site lighting.

Together with a LED lighting installation, Breese and Earle Electrical Services Ltd will be installing an analogue addressable fire alarm system, small power, machine wiring and power supplies to a new Bio Mass boiler that will serve the entire site.

20150324_083819_resized (Copy)